Tuesday, June 10, 2014

 Week 10 Monday

 June 9 2014

Crazy day on the job Monday.  There were at least a dozen guys working .  BTW Just the way I like it.  At this rate we could be done in no time.  Met with the cabinet maker yesterday, so that is in the works.  

Wadhwani – White Gloss, Orange Wall, Black Lowers

Will have a combination of white lacquered cabinets and a dark grey textured wood.

Hmmm Contractor came up with a new glitch yesterday when he mentioned that there is a new code which says that operable window have to be at least 24"  off the ground.  Mine are all 18" and maybe less once we level out the floor.  He is going to talk to the inspector about it as we are an existing condition.  The  windows open at the top for air.  But the problem is that they also open in so that you can wash them from the inside.  
 
Lot's of electrical questions and still not totally understanding all of the applications of the Control 4 system but getting closer.  Installing Cat 6 and hard wired phone everywhere as we seem to have  a lot of interference in our aerie.  Seems there are a few problems with being on the top of the hill, lot's or things swirling around us that make for bad reception.

Stay tuned and watch the transformation.  If you want a hint of it's future look at my Pinterest posts.  http://www.pinterest.com/jdzinesf/hyde-street-penthouse/