Week 27 Friday


October 7 2014


Painters are on the job and everything is looking swell.  Met with the door company on Monday and we finally have the doors installed correctly.  The order has been placed and they are in the works.  Should be here in 5 or 6 week.


Fireplace ready for tile.  I will have it shipped from LA next week as soon as the overlay is finished.  They start on Friday and are working through the weekend and into the beginning of the week to get it finished.  I think I have decided on black floors.  I'm waiting to see the samples.


Both the bathrooms are ready for the stone measure a week from Friday.  They told me it was a three week turn around.  They can't do the tile until the stone is in place.  The old catch 22.

Only half my cabinets are here and I was just told the rest wouldn't come until the end of the month.  This is really a bitch as I ordered them ages ago.  Again can't measure for stone until the cabinets are in so doubt we'll be done when expected.

I am so ready to have this done and move back in.

Stay tuned and watch the transformation.  If you want a hint of it's future look at my Pinterest posts.  http://www.pinterest.com/jdzinesf/hyde-street-penthouse/