Friday, November 14, 2014

Week 32 Friday


November 14 2014

The Fox installers showed up with the marble/tile for my guest bathroom yesterday and could not get it into the room.  When I went to talk to them I found out that they had also make several cuts in the stone for the right side.  Then they suggested that they cut the stone on the left side to match one of the cuts on the right side so that they could get it in.  I was not happy about this.  I discussed this with my rep and we came up with another solution.  They left with my wall units and returned later with the tub decking for my master bath.  They will be back tomorrow with the material for my wall today.


Tub


Laundry

Stacking washer/dryer on the left, waiting for one piece so we can install.  This is also a walk in closet with cabinets on both sides that still need to be installed.


Fireplace 

Tile installation in the Living room will be done today.  He can also start on the Master bath when he is done in the LR now that the tub decking is in place.  I picked up the tile for the guest bathroom yesterday and they can start installing that once Fox get's the wall tile in place today.

Frame-up tile collection by Refin

Wall tile for guest bathroom

Stay tuned and watch the transformation.  If you want a hint of it's future look at my Pinterest posts.  http://www.pinterest.com/jdzinesf/hyde-street-penthouse/