Wednesday, July 2, 2014

 Week 13


Tuesday July 2nd 2014

Of course nothing but problems with the linear drain.  And it is a holiday week so everyone is on vacation.  The plumber said it wouldn't work, but then this system is new to him.  So I start making phone calls to supplier, then rep, then the manufacturer, who of course is not available.  I finally get a call back from the company late in the afternoon.  I will have to discuss this information with the contractor this morning.

Tech support says no problem the plumber can install with the existing depth of the floor joists, so the plumber is wrong about that.  The problem is with the floating concrete floor.  He is worried that the concrete will not hold up over time and that is going to cause cracking.  I may have to use tile in both the bathrooms to insure the integrity of the waterproofing material.  More to talk to the contractor about.

It's never easy with remodels and using new systems.  Stay tuned for the results.

Meanwhile the electric is proceeding with vigor, something is going right.

Inspiration for bathroom lighting

Stay tuned and watch the transformation.  If you want a hint of it's future look at my Pinterest posts.  http://www.pinterest.com/jdzinesf/hyde-street-penthouse/

www.jd-zine.com

No comments:

Post a Comment