Friday, July 25, 2014

 Week 16 Friday

July 25th 2014




Met with the concrete overlay person yesterday.  The picture above is just what I would like my floors to look like.

I also met with the modern door company with the name Old World Door Company.  He said 50% of their business is now the modern and not the old world.  I think they need a name change.  We finalized almost everything and the metal door jambs will be here next week.  We need them installed for the sheet rockers.  A really interesting system, made in Italy of course. 


Meet with the AV foreman today to double check all the wiring is in and in the right place.  Tons of cords building up in my AV closet.

The Heating contractor is here installing new duct work and the linear vents and return air in the ceiling.

Truitt and White just called and my windows arrived last night.  They are being delivered on Monday morning along with the tub we need to install.  Things are moving along.  As soon as the windows are in the sheet rockers will be here to close up the spaces.

Have a great weekend, I know I will have a smile on my face.

Stay tuned and watch the transformation.  If you want a hint of it's future look at my Pinterest posts.  http://www.pinterest.com/jdzinesf/hyde-street-penthouse/

www.jd-zine.com




No comments:

Post a Comment