Friday, May 9, 2014

 Week 5 Thursday

May 8 2014

The scaffolding arrived today and was assembled along the north side of the building.  The beams are supposed to arrive on Friday or Monday.  Of course a new problem has reared it's ugly head.  Our sub floors are like the rolling seas.  It's going to be a lot of work to level them.  


The stairs
I wouldn't want to be up here
Hmmm that level is the way the flooring should be
Out 1 1/2 " in 3 feet

Stay tuned and watch the transformation.  If you want a hint of it's future look at my Pinterest posts.  http://www.pinterest.com/jdzinesf/hyde-street-penthouse/