The scaffolding arrived today and was assembled along the north side of the building. The beams are supposed to arrive on Friday or Monday. Of course a new problem has reared it's ugly head. Our sub floors are like the rolling seas. It's going to be a lot of work to level them.
The stairs
I wouldn't want to be up here
Hmmm that level is the way the flooring should be
Out 1 1/2 " in 3 feet