Not a very exciting week.  At least the demo crew removed the huge piles of debris and the carpenter is building the walls.  Still more coming out though as the existing walls are not adequate to meet code.  Master Bath walls are in place.  Next week will be the re-framing of the roof joists for the new open concept kitchen.

Master Bath Dressing Area

Drawer under floating trough sink
Trough sink with drawers below

Meeting with concrete sub on Monday to see if we can level the floors.

Stay tuned and watch the transformation.  If you want a hint of it's future look at my Pinterest posts.  http://www.pinterest.com/jdzinesf/hyde-street-penthouse/