Week 1 Monday
April 7th 2014
Lots of activity this morning. Plumber shutting everything down to make sure we don't have any unexpected leaks. Electrician removing all of the old lighting fixtures. And then there is the demo crew. All of this is happening at the same time.
The demo crew is using large pick axes to pull down all of the old lath and plaster. It is happening fast, before the day is up 3 rooms have empty walls. All that is left is the old knob and tube electrical and the outside studs.
Stay tuned and watch the transformation. If you want a hint of it's future look at my Pinterest posts. http://www.pinterest.com/jdzinesf/hyde-street-penthouse/
www.jd-zine.com
Master Bedroom
Dining Room
Living Room
www.jd-zine.com
No comments:
Post a Comment